Project

General

Profile

New User Features 33 » History » Version 13

Anchi Cheng, 01/17/2018 06:23 PM

1 1 Anchi Cheng
h1. New User Features 33
2
3 8 Anchi Cheng
h2. [[Volta Phase Plate Usage|FEI Volta Phase Plate Integration]]
4 1 Anchi Cheng
5 8 Anchi Cheng
Automated control of hole-free Volta phase plate from FEI, including switching to the next patch, pre-charging, and procedure we use to evaluate phase plate installation.
6 1 Anchi Cheng
7 8 Anchi Cheng
h2. [[Leginon "MSI-T-Tilt" Application]]
8 1 Anchi Cheng
9 11 Anchi Cheng
Application to make collecting large set of  tilted images easier as described in Tan et. al. Nature Methods 14, 793–796 (2017) doi:10.1038/nmeth.
10 4 Anchi Cheng
11 1 Anchi Cheng
h2. General Features
12
13 8 Anchi Cheng
h3. Target Finder:
14 1 Anchi Cheng
15 8 Anchi Cheng
# Option to force user to add focus target: This feature is default to require focus targets but can be set to "Do not require focus targets in user verification" in advanced settings dialog in any Target Finder.
16 12 Anchi Cheng
# [[New_Exposure_Targeting_Set-up_in_MSI-T_for_Multiple_holes|Multiple Hole Template generation]].
17 8 Anchi Cheng
# Using Focus hole selection option with an offset.  Useful when the edge of the hole is needed to perform autofocusing.
18
# Option to define minimal hole stats standard deviation.
19
# Red square next to the node name Indicates that settings chosen by the user currently are such that tree-depth traversal automated data collection would be hindered.  For example, "Allow user verification" is turned on.
20 1 Anchi Cheng
21 8 Anchi Cheng
h3. [[Slack notification for Leginon errors]]
22 1 Anchi Cheng
23 13 Anchi Cheng
* General time out and error notification with Slack
24 1 Anchi Cheng
25 8 Anchi Cheng
h3. Refinement of the behavior of Reference nodes such as "Align ZLP"
26 6 Anchi Cheng
27 8 Anchi Cheng
# Add a reference target from a Reference Node at the center of the image acquired that can be more accurately moved to with iterative move by Navigator. (Need to use new MSI applications).
28
# Set settle time after Leginon is moved back from the reference target.
29 6 Anchi Cheng
30 8 Anchi Cheng
h3. Enforcing dark current image acquisition.
31
32
# Automatically acquire and update hardware dark current image on K2 camera while "N2 filling" is running.
33
# Automatically acquire and update hardware dark current image on K2 camera for acquiring Bright reference image.
34
35
h3. Tomography
36
37
# Aternating tilt sequence
38
# Option to use the preset exposure time at all tilts and thus ignore dose adjustment.
39
40
h3. Focuser
41
42 9 Anchi Cheng
# [[Special_Beam_Tilt_Calibration_for_Phase_Plate|Option to use diagonal beam tilts for phase plate data collection]]
43 8 Anchi Cheng
# Not to recheck drift until it passes at first time. Such was the default behavior but tend to delay stabilization since the first measurement always shows higher drift from beam induced movement.
44
45
h3. Stage alpha tilt stability enforcement.
46
47
This is added because the goniometers on some scope slips in the way that the position reached is always larger than the requested angle, causing the tilt angle drifts over time.  The stage tilt is enforced in
48
49 6 Anchi Cheng
* Grid Targeting Node Settings
50
* Turn on the advanced settings "Tilt the stage like its parent image" in all Acquisition node class if the tilt needs to be preserved.
51
52 8 Anchi Cheng
h3. Image rotation and scale modification calibrations
53 6 Anchi Cheng
54 8 Anchi Cheng
For highly defocused image that has introduced rotation and size change of the image.
55
56 6 Anchi Cheng
h3. Some TEM remote control in Leginon (in development) (Need to use new MSI applications)