Project

General

Profile

Sub-3Å proteasome stage-shift data collection » History » Version 6

Anchi Cheng, 08/16/2016 05:24 PM

1 1 Anchi Cheng
h1. Sub-3Å proteasome stage-shift data collection
2
3
h2. Instruments
4
5
# Scope: FEI Titan-Krios
6
# Camera: Gatan K2. mount directly. 1.21 Å at 29kx scope nominal mag
7
8 5 Anchi Cheng
h2. Grid
9 1 Anchi Cheng
10 5 Anchi Cheng
* 1.2/1.3 C-flat carbon support; 400 mesh Copper grid.
11
12 1 Anchi Cheng
{{include(Krios-K2-TSRI)}}
13 5 Anchi Cheng
14
h2. Application:
15
16
MSI-T2 Advanced (= MSI-T + "Beam Tilt Image" for coma-free alignment + "N2 Filling" for Krios auto nitrogen filler)
17
18
h2. Presets Manager:
19
20
No preset cycling (Krios has its own normalization).
21
22
h2. Queuing usage:
23
24
Hole Targeting: Queuing, target at the carbon area to cover four holes.
25
Exposure Targeting: Queuing. manual targeting.
26
27
h2. Move method to reach the targets:
28
29 6 Anchi Cheng
Hole: Presets Manager (modeled) stage position movement
30
Focus:  Presets Manager (modeled) stage position movement
31 5 Anchi Cheng
Exposure: [[Iterative_Stage_Movement|Navigator Iterative movement]]: Target Tolerance: 1e-7 m; Acceptable Tolerance: 3e-7 m
32
33
h2. Wait time before final exposure:
34
35
40 seconds