Project

General

Profile

Actions

Feature #10280

closed

allow tomography backlash correction pause time on the first image adjustable

Added by Anchi Cheng over 3 years ago. Updated about 2 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
-
Target version:
Start date:
06/01/2021
Due date:
% Done:

0%

Estimated time:
Deliverable:

Description

Some scope configuration (Krios Blank automatically engaged between mag change, for example) requires a longer wait time than preset changes. This gives it extra pause. Also added display so that it can be checked.

Actions #1

Updated by Anchi Cheng about 2 years ago

  • Status changed from Assigned to Closed

works.

Actions

Also available in: Atom PDF