Actions
Feature #12248
closedall project assignment in autoscreen
Start date:
03/18/2022
Due date:
% Done:
0%
Estimated time:
Deliverable:
Description
Not all grids are necessarily from the same project. The old method assumes all projects are from the same project as the example old session.
Updated by Anchi Cheng almost 3 years ago
- Description updated (diff)
Two ways to assign:
1. Add a third column in the text file with project id number.
2. Leave text filename entry blank to use gui.
Actions