Project

General

Profile

Getting Started » History » Version 7

Amber Herold, 04/27/2010 04:13 PM

1 1 Amber Herold
h1. Getting Started
2
3
4 4 Amber Herold
h2. Full (Super User) Manual - Getting Started
5 1 Amber Herold
6
7
8 4 Amber Herold
These steps are a general overview of the entire procedure involving
9
installation, microscope alignment, calibrations, and using Leginon applications (e.g.
10
Manual, Calibrations, MSI).
11
12
[[Getting Started as a Super User]]
13
14
h2. Installation (System Administrator) - Getting Started
15
16
17
18
These steps are geared soley towards the system administator(s) that will installing
19
Leginon and setting it up initially for the rest of the Leginon users that need not be
20
concerned with these details.
21
22
23
[[Getting Started as a System Administrator]]
24
25
26
h2. Short Manual (Basic Leginon User) - Getting Started
27
28
29
30
These steps are intended to help the basic Leginon user who will operate Leginon (and
31
not care about installation or the first-time calibrations).
32
33
34
[[Getting Started as a basic Leginon user]]
35
36
37 2 Amber Herold
38
______
39
40
[[Minimum Requirements and current NRAMM setup|< Minimum Requirements and current NRAMM setup]]
41
42
______