Project

General

Profile

RCT run protocol from a user » History » Version 6

Zhening Zhang, 10/28/2016 11:08 AM

1 1 Anchi Cheng
h1. RCT run protocol from a user
2
3
h2. Setup
4
5
h3. Days before
6
7
* Pump down stage
8
*   Cryo-cycle for 4 hours (240 min)
9
*   Prepare grids 
10
11
h3. Scope alignments
12
13
2.2.1 no sample
14
15
    gun shift/tilt
16
    condenser aperture
17
    condenser stig.
18
    check if cold trap is in
19
    adjust eye pieces 
20
21
2.2.2 with sample
22
23
    z-height
24
    focus both M and SA modes
25
    objective stig.
26
    objective aperture at hi mag, use focus to shrink beam, not intensity
27
    at zero defocus
28
        beam tilt pivot points X,Y
29
        rotation center 
30
31
h3. Presets and Magnifications
32
33
|preset|mag|camera config|defocus|notes|
34
|gr|120X|512x8|0|do not cycle through|
35
|sq|1700X|1024x4|-3.0e-4|for square_centering|
36
|cs|1700X|1024x4|-3.0e-4|for rct_targeting, copy of sq|
37
|hl|5000X|512x8|-5.0e-5|image shift alignment and z-focus|
38
|en|50kX-100kX|4096x1|-1.5e-6 to -3.5e-6| |
39
|fa|50kX-100kX|512x4|-1.5e-6|beam focus and drift checks|
40
41
h3. Leginon
42
43
2.4.1 pre-Altas
44
45
    beam shift/intensity for each preset
46
    align image shifts btw presets
47
    optional: fine tune rotation center in Leginon, available in any focus node using the fa preset
48
    on rare occasions: check optical axis using Leginon tool, this is only required if the square is shifting alot when you tilt the stage 
49
50
2.4.2 post-Atlas
51
52 5 Anchi Cheng
    RCT node settings optimization
53 1 Anchi Cheng
        make sure the number of features is between 700 and 1500
54
        take a picture both with and without the grid bar
55
        take a picture both untilted and tilted 
56
    calibrate dose
57
    RCT node setup
58
    re-align presets
59
    re-center objective aperture 
60
61
h2. Running Leginon RCT
62
63
    Start a square:
64
        Square Targeting (if you have an atlas)
65
            Go to "Square Targeting"
66
            Hit the reload button
67
            Select a new square with the green cross
68
            Click the play |> button 
69
        Simulate Square (if you do NOT have an atlas)
70
            Go to "Square"
71
            Hit the simulate target button 
72
    Square centering
73
        When Leginon is finished, a question mark will appear next to the "Square Centering" node
74
        Click on the "Square Centering" node
75
        Select one z-focus position (blue cross) and one imaging position (green position) close to the center of the square
76
        Click the play |> button 
77
    RCT Targeting
78
        When Leginon is finished setting the z-height, a question mark will appear next to the "RCT Targeting" node
79
        Click on the "RCT Targeting" node
80
        Now you select all the holes to image (not too close to the edge) and a single focus position
81
        Optional: obtain a picture of the tilted square
82
            Click on the "Navigation" node
83
            Open up VNC viewer of the tecnai
84
            In the VNC window, set the tilt angle to the desire angle
85
            In the "Navigation" node, collect an image by clicking on the acquire button (camera logo) at the top
86
            Important, in the VNC window, return the tilt angle to zero degrees, otherwise all your images will fail
87
            Now select you targets in the "RCT Targeting" node and view the tilted image in the "Navigation" node. Jump back and forth between the two nodes until you select all holes present in both images. 
88
        When finished, hit the play |> button 
89
    Focusing
90
        If manual focusing is enabled, wait for the manual focus window to pop up
91
        focus the microscope, reset the defocus, and click the red stop button. 
92
    Watch your images in the "RCT" node 
93
94
h2. Nitrogen fill
95
96
Since RCT only focuses once per square, when you fill the dewar, you must refocus to account for changes in the z-height and focus during refill and there is no check for drift calm down so you must manually wait for drift to subside.
97
98
Steps in Nitrogen fill:
99
100
    Pause RCT node
101
    Wait until Leginon is paused
102
    Fill holder and cold trap dewars
103
    Turn off lights
104
    Check if objective aperture is inserted
105
    RESET TIMER
106
    Focus
107
        simulate z-focus
108
        send hole preset to scope
109
        navigate to good focus spot in navigator
110
        simulate focus in the focus node
111
        repeat focus until drift subsides 
112
    If there is an empty hole: you can measure dose or collect bright fields
113
    Declare drift
114
    Hit play button on RCT node
115
    Check images to make sure they are good
116
    Uncheck user verification of targets 
117
118
    This page was last modified 16:45, 16 July 2010.
119 2 Anchi Cheng
120
121
__________________
122
123 3 Anchi Cheng
[[RCT calibration| < RCT application calibration]]