Project

General

Profile

Actions

Feature #15515

closed

Add pause to transformmanager.py

Added by William Rice about 1 year ago. Updated 3 months ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Category:
-
Target version:
Start date:
10/13/2023
Due date:
% Done:

0%

Estimated time:
Deliverable:

Description

  • If a stage movement occurs after exposure targeting has been set up (eg. ZLP alignment), transformmanager checks that stage is in the correct place and does any needed correction
  • This is done using the targeting mag, so it needs to take an image at that mag
  • currently it stays at that magnification, then goes back to the preset manager to continue imaging
  • If wait time is 0 in preset manager, there may not be enough time for the beam to stabilize after changing back to high-mag imaging, leading to a degraded image
  • this change sends the original preset back to the microscope and then pauses before continuing image
  • pause time is still set in the "settings" menu for this node
  • 5s is good for the NYU Krios
Actions

Also available in: Atom PDF