h1. Upload Images to a new Project Session
2
3 2 Amber Herold
# Select the project DB tool from the Appion and Leginon Tools start page at http://YOUR_SERVER/myamiweb.
4 4 Amber Herold
# Select your project by clicking on the project name.
5
# Under the Experiments section, select *Upload images to new session*.
6 5 Amber Herold
 
7
*Upload Images to new session button*
8
!http://emg.nysbc.org/attachments/447/uploadimages.png!
9 6 Amber Herold
 
10
# Follow the instruction provided in mouse-over tool tips.
11 7 Amber Herold
 
12 8 Amber Herold
*Upload Images Screen*
13 9 Amber Herold
!http://emg.nysbc.org/attachments/1351/uploadimage.jpg!
14 1 Amber Herold
15 10 Amber Herold
h2. Tips
16
17
The cs value that you enter during upload should be the correct value for the scope that the images were collected on. It is highly recommended that you make an effort to discover this value prior to uploading images to Appion. If you have uploaded images with the incorrect cs value, a system administrator with access to the Appion and Leginon databases can assist with changing the cs value associated with your images.
18
19
These are the steps that need to be done to change the cs value. (Applies to version 2.2 and later)
20
# Note the session Id that you wish to change
21
# go to the leginon database (ex. dbemdata)
22
# go to the InstrumentData table and see if there is an instrument called AppionTEM with a cs value that is the same as the cs value you wish to change to. If it exists, note the DefId, if not, add one with the correct cs value and note its defId.
23
# Go to ScopeEMdata table and search for the session that you wish to change.
24
# Modify the REF|InstrumentData|TEM for that session with the defId of the AppionTEM with the correct cs value.
25
# Go to pixelSizeCalibrationData table and search for the session. 
26
# Edit this entry and turn off the option to update the timestamp to the current time. *Make sure the timestamp is not changed when editing this table.* Update REF|InstrumentData|TEM with the defId of the correct TEM.
27
28 1 Amber Herold
29